Haier BD-478A Manual do Utilizador Página 39

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 61
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 38
38
(2) Please keep the pliers, pipe cutting unit and Hansen valve clean, and
keep them away from grease dirt.
12.5.3 Procedure for filling equipment
(1) Preparation before use
Visually inspect recovery machine for abnormalities, etc.
Keep all valves closed to equipment until really to proceed.
(2) Evacuation
Connect recovery machine hoses to system fittings
Switch on power.
Switch on motor.
Open all related valves.
Observe the pointer of vacuum meter when it is accessing the mark 1.
Evacuation time shall not be less than 45 min.
After evacuation close valves.
MAINTENANCE SERVICE AND TROUBLE SHOOTING
Maintenance Service and Trouble Shooting
Switch off motor.
PDF created with pdfFactory trial version www.pdffactory.com
Vista de página 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 60 61

Comentários a estes Manuais

Sem comentários